Separate follow-up times can be entered for heating circulation pump(s) and domestic-hot-water charging pump(s).
Input alignment
Temperature
Sauter nickel temperature sensors guarantee precise temperature measurements. However, line resistance compensation may
be required if the connecting cables are particularly long.
The following temperature measurement inputs (Ni 1000
Ω
at 0 ° C) can be calibrated within a range of
±
9.9 ° C.
Please ensure that the temperature sensor to be calibrated has sufficient time (1...2 hrs) to adopt the ambient temperature.
(I... = Input... = Input...)
SERV setting value
No.
Function
08
05
Follow-up period of heating circulation pump(s) after calculation of the corresponding flow temperature
setpoint = 0
(0...19) (min)
09
05
Follow-up period of domestic-hot-water charging pump(s) after charging has been completed.
Follow-up of LP1 can be interrupted by the controller if certain conditions are fulfilled.
A second charging pump LP2 is always programmed for the entire follow-up period if installed.
(0...19) (min)
SERV setting value
No.
Function
10
0.0
Calibration of input I
0
(terminal 15)
11
0.0
Calibration of input I
1
(terminal 17)
12
0.0
Calibration of input I
2
(terminal 18)
13
0.0
Calibration of input I
3
(terminal 20)
14
0.0
Calibration of input I
4
(terminal 21)
15
0.0
Calibration of input I
5
(terminal 23)
16
0.0
Calibration of input I
6
(terminal 24)
17
0.0
Calibration of input I
7
(terminal 26)
R
–
30
–
7 000458 003