![Satec PM130E Installation And Operation Manual Download Page 54](http://html.mh-extra.com/html/satec/pm130e/pm130e_installation-and-operation-manual_1200370054.webp)
Appendix: Technical Specifications
47
Key:
PT = external potential transformer ratio
CT, CT Primary Current = primary current rating of external current transformer
FSU = voltage full scale
FS
I
= current full scale
@ 10% to 120% of voltage FS and 2% to 150% of current FS
Higher resolution is achievable via communications
Where the current is
>
10% FS, the energy accuracy is better than 1.5% Rdg.
Additional Notes
1. Accuracy is expressed as
±
(percentage of r percentage of full scale)
±
1 digit. This does not include
inaccuracies introduced by the user's potential and current transformers.
2. Specifications assume a reference temperature of 20 - 26
°
C.
3. Specifications for kvar, kVA and PF assume
voltage and current waveforms with
THD
≤
5%
4. Ordinary measurement error is considerably less than the specified accuracy which indicates maximum error.
Summary of Contents for PM130E
Page 1: ...Se Series PM130 Powermeters Installation and Operation Manual BG0306 Rev A1 ...
Page 2: ...Series PM130 Powermeters Installation and Operation Manual ...
Page 6: ...iv Quick Start TYPICAL INSTALLATION see Section 2 2 4 for full instructions Wiring Mode 4LL3 ...
Page 12: ...Chapter 1 Introduction 5 Instrument Dimensions Figure 1 1 PM130 Dimensions ...
Page 14: ...Chapter 2 Installation 7 Figure 2 2 The PM130 Terminations ...
Page 17: ...Chapter 2 Installation 10 Figure 2 4 Current Input Connection ...