![Satec PM130E Installation And Operation Manual Download Page 30](http://html.mh-extra.com/html/satec/pm130e/pm130e_installation-and-operation-manual_1200370030.webp)
Chapter 4 Setup Menus
23
4.4 Alarm/Event Setpoints Setup Menu
Your instrument provides 16 alarm/event setpoints that can
monitor a wide variety of events; in turn, these events can be
programmed to trigger specific actions. This menu is used to
specify the events to be monitored by the setpoints, and actions to
be triggered by those events.
To program a setpoint (all 16 can be assigned to the relay) you
need to define up to six setup parameters: the setpoint trigger
parameter, operate and release limits, optional operate and
release delays, and the setpoint action. Tables 4-4, 4-5 and 4-6 list
the setpoint setup parameters, available triggers and setpoint
actions.
Example:
Trigger
parameter
Setpoint 1 is set to monitor the real-time
high current on phase 1 (the
trigger
parameter).
Operate limit }
}
}
}
Release limit }
The
operate (
On
) and release (
OFF
)
limits
which determine setpoint
operation are defined as 1200A and
1100A respectively.
Operate delay
}
}
}
Release delay
}
The
delays before operation (
On d
)
and release (
OFFd
)
are set at 5
seconds and 10 seconds respectively.
Setpoint action
The
action
to be triggered is relay
operation.
To select a setpoint:
Scroll to the desired setpoint using the up/down arrow keys.
To view the setup options for the setpoint:
Press to activate the middle window.
SP 1
RHi.C1
triG
SP 1
5
On d
SP 1
10
OFFd
SP 1
1200
On
SP 1
rEL
Act
SP 1
1100
OFF
SELECT
SELECT
CHG
SEtP
ENTER
ENTER
Summary of Contents for PM130E
Page 1: ...Se Series PM130 Powermeters Installation and Operation Manual BG0306 Rev A1 ...
Page 2: ...Series PM130 Powermeters Installation and Operation Manual ...
Page 6: ...iv Quick Start TYPICAL INSTALLATION see Section 2 2 4 for full instructions Wiring Mode 4LL3 ...
Page 12: ...Chapter 1 Introduction 5 Instrument Dimensions Figure 1 1 PM130 Dimensions ...
Page 14: ...Chapter 2 Installation 7 Figure 2 2 The PM130 Terminations ...
Page 17: ...Chapter 2 Installation 10 Figure 2 4 Current Input Connection ...