3. Disassembly and Reassembly
14.
Release the stay stacker after removing 2 screws.
15.
To remove the finisher main PBA, remove 2 screws.
16.
Remove 2 screws.
17.
Lift the shield stacker up and unplug the connector.
18.
Unplug all connector on board. Remove 3 screws and 3
fixer. And release the PBA.
19.
To remove the Finisher connector, remove 2 screws.
3-68
Copyright© 1995-2016 SAMSUNG. All rights reserved.