163
B
UILDING
M
ANAGEMENT
S
YSTEM
4) Connection diagram
For power distribution
OnOff
controller
1PXFSMJOF
R1-R2
R1-R2
R1-R2
F1-F2
F1-F2
F1-F2
Watt-hour meter
Electrical
substation
1*.
f
MIM-B16(PIM) should be connected separately with outdoor units or controllers.
f
MIM-B16N(PIM) can be connected with outdoor units or controllers to same channel of DMS2.
BACnet GW
5) Wiring
F1 F2
R1 R2
F1 F2
R1 R2
(CH = Channel)
(1) Connecting outdoor unit directly
t.BYJNVNPVUEPPSVOJUTDBOCFDPOOFDUFEUPFBDIDIBOOFM
t5PUBMPVUEPPSVOJUTDBOCFDPOOFDUFE
(2) Connecting OnOff controller/Touch centralized controller
t.BYJNVN0O0GGDPOUSPMMFS5PVDIDFOUSBMJ[FEDPOUSPMMFSDBOCFDPOOFDUFEUPFBDIDIBOOFM
;
Note
BACnet GW can connect outdoor unit and OnOff controller/Touch centralized controller at the same time.
Outdoor unit and OnOff controller/Touch centralized controller can be connected to 1 communication channel at the same time.
Samsung RS485
communication
BACnet
communication BMS
[¥]UwGG ¥UGGGX]Z
YWX[TW[TY\GGG㝘䟸G[aZ]a[Y