Control Systems
190
1. S-Checker
6) Main function
MIM-C10N
T
est run report
D
isplay of the cycle information
t
Test run report menu will inspect the system in real time and notify the result.
t
Cycle Info : it displays cycle data of the indoor and outdoor unit.
%JTQMBZFEJUFNJTTBNFBT4/&51SP
[Cycle info : Outdoor unit]
Displays the cycle information
of the connected outdoor unit.
[Cycle info : Indoor unit]
Displays the cycle information
of the connected indoor unit.
Maximum of 64 indoor units'
data can be displayed.
Section
Function
Inspection step for
test run
During outdoor unit test run, test run
prgress will be displayed in the
progress bar on top part.
Items for test run
Status for items of test run will be
displayed and 'NG' will be
displayed for undetermined items.
Input site
information
Install engineer can input the site
information
Create test run
report
Make Test Run File :
Saves
&&130.EBUBPO4$IFDLFS
When saving is completed “LOG:
Ready to make Report” message
will appear.
Make Report :
Creates Test Run Report.
1SPHSFTTDBOCFDIFDLFEGSPN
“LOG: Making Test Run Report.
1SPHSFTTJT99wNFTTBHF
t
After completing the test run report, data
will be saved on the folder (name : mBiss)
of mobile device as csv and pdf file.
VII
VII
Test run tool for system air conditioner installation
[¥]UwGG ¥UGGGX`W
YWX[TW[TY\GGG㝘䟸G[aZ]a\X