
E-
31
ENGLISH
Using the DMS through the Web (Continued)
Viewing Power Distribution Result
1
Click ‘SETUP FOR POWER DISTRIBUTION’ on the DMS web
page.
2
When the Virtual channel for the Indoor/Outdoor unit is set,
above screen will appear.
3
Select the time period and click ‘calculation’ to display the
result.
MIM-D00_IB_E_29777-2.indd 31
2009-05-08 ソタタ・10:08:12