Using the DMS through the Web (Continued)
View Error History
Function Details
Users can set, edit, and delete schedules for controlling the DVM
system.
Set, Run and View Schedule
Using the Schedule Function
The Schedule List screen shows all current schedule information
saved in the DMS.
1
On the schedule screen, a schedule can be created, edited,
viewed, and deleted.
2
Press the ‘New schedule’ button in
to create a new
schedule. (Refer to Adding a Schedule)
3
Press the ‘Edit’ button in
after selecting a schedule in
to
edit a set schedule. (Refer to Adding a Schedule)
4
Press the ‘Delete’ button in
after selecting a schedule in
to delete the selected schedule.
5
Press the ‘Run schedule’ button in
after selecting a
schedule in
to run the selected schedule.
6
Press the ‘Stop schedule’ button in
after selecting a
schedule in
to stop running the selected schedule.
7
Press the ‘All stop’ button in
to stop running all the
schedules.