BEF
ORE OPERA
TION
Check points after installation
60
English
7
Change the set temperature if necessary in main
control.
Default value
Cooling
Heating
7°C (45°F)
45°C (113°F)
f
Temperature can be adjusted by K3 and K4.
Set
temperature
K3
K4
0.1°C (0.18°F) up
0.1°C (0.18°F)
down
f
Set temperature range
Set
temperature
range
Cooling
Heating
Low
Room
-10 ~ 25°C
(14 ~ 77°F)
5 ~ 25°C
(41 ~ 77°F)
25 ~ 55°C
(77 ~ 131°F)
- Use brine when using in low temperature
condition and maintain the concentration.
8
Operation on/off by tact switch is only possible when
main control is set.
Operation
mode
K1
K2
Operation ON
Operation OFF
9
Press and hold K5 and K6 for 3 seconds to initialize
hydro controller.
※
After checking the main control, to use the remote
control, be sure to configure the following settings.
f
Set the chiller address iin the hydro controller option.
f
Set the modules for each chiller in service mode of
the module control. (The group setting is optional.)
f
Set the main units for the module and group in
service mode of the module control.
CAUTION
ŷ
Make sure to close the top and bottom part of the
product cabinet during operation. If you operate
the unit with the front cabinet open, it may cause
damage to the product and you may not get the
precise data from S-NET pro.
Summary of Contents for AG010KSV Series
Page 85: ...MAINTENANCE 85 English MEMO ...
Page 86: ......