27
English
Technic
al
data
P
P
FCU / RADIATOR
HEATING
UNDERFLOOR
HEATING
5
ZONE 1
ZONE 2
c)
OK
+
-
OK
+
T
P
T
P
DHW
COLD WATER CONNECTION
7
6
P
TB-
A
Communication F1/F2
Ø 28 mm
Ø 28 mm
Ø 22 mm
Ø 22 mm
Wi-Fi
2
Ø 28 mm
Ø 28 mm
TB-
C
Power Supply
a)
9
T
T
T
8
TB-C
V1/V2 (12V Power)
TB-C
Communication F3/F4
B2/B3/B5
(AC 230V, 22mA)
B10/B11
e)
(AC 230V, 22mA)
B14/B15
e)
(AC 230V, 22mA)
17/18
19/20
3
4
4
CNS045, BLU
b)
R
R
1
10
Power Supply
a)
(380~415 V, 50 Hz,
Ф
3)
(380~415 V, 50 Hz,
Ф
3)
-
b
a)
Samsung EHS Cl
imat
eHub Mon
o is a
vailabl
e in
1-ph
ase an
d 3-phase
ve
rsion.
b)
Mixin
g
val
ve t
empe
ratur
e sen
sor
for
fl
oor
h
eatin
g c
ome
s with
tan
k int
egr
at
ed h
ydr
o un
it (
15 m r
ed c
abl
e, bl
ue c
onne
ct
or
on
PB
A).
c)
Wh
en both
zone
s ar
e simultane
ousl
y The
rmo On, th
e ope
ration
is pe
rforme
d base
d on
Zone
2
. S
et th
e z
one
with
th
e h
igh
er
se
t t
empe
ratur
e t
o Z
one
2
.
d)
Air
ven
t incl
uded in tank int
egr
at
ed h
ydr
o unit. In c
ase th
at th
e w
at
er
piping
w
oul
d be
loc
at
ed in a high
er
position
th
an
th
e air
ve
nt of th
e tan
k int
egr
at
ed h
ydr
o un
it, it is nec
es
sary
to add
additional one
at th
e h
igh
est position of th
e w
at
er
cir
cuit.
e)
Pumps
for
radiat
or
an
d
floor
h
eating c
an
be
re
gulat
ed (
on/
off
) b
y tan
k int
egr
at
ed h
ydr
o un
it (t
ermin
als B10
/B11 an
d B14/B15) or
th
eir
o
wn r
egulat
ors
. Based on th
e c
urr
ent l
ogic onl
y with
tw
o z
one
s c
ontr
ol
with
wir
ed r
emot
e c
on
troll
er
. Not
with
th
ermostat.
f)
200 L
tank in
tegr
at
ed h
ydr
o unit h
as six c
onn
ection
pipe
s (
w
at
er
inl
et/
outl
et, spac
e h
eating in
le
t/outl
et and DHW
inl
et/
outl
et
)
wh
ile 2
60 L
model h
as additional pipe
for
DHW
cir
culation.
g) Th
e 4-pipe
structur
e buff
er
tan
k sh
own in th
is sche
me
is an
ex
ampl
e of the
in
stallation, and th
e buff
er
tan
k installation in the
actual sit
e c
an diff
er
depe
nding on
th
e pr
oje
ct r
equir
emen
ts
.
Piping & Wiring diagram
Summary of Contents for AE CXYD Series
Page 29: ......