
Operator’s manual
Twin-rotor rotary rake
Z2-780; Z2-840
- 16 -
W
S
K
5.1. Attaching the rake to the tractor
WARNING:
-
Only hitch and unhitch machine on a flat surface with compact dirt.
-
Keep everyone away from area between rake and tractor. Any accidental
manoeuvring with the aggregate might cause crushing of unauthorized
personnel.
-
Be careful near link road zone of tractor's rear power lift. Contains sharp
parts.
-
The machine should be mounted on a level ground.
Rotary rake
Z2-780 / Z2-840
works properly with tractors (class 2.0 and power from 60 HP).
The rake should be attached to a tractor by means of tractor's lower pull-cables as provided on
Fig. 6
. For this purpose drive the tractor at the rake's catch, and then place hangers
W
of
tractor's lower pull-cables on pins
S
on the rake's linkage.
Once the rake is mounted turn support leg back and protect it with pin
K
.
Connect hydraulic hoses:
-
Z2-780 –
one connector for lifting of work assemblies,
-
Z2-780 H
and
Z2-840 –
one connector for lifting of work assemblies and a pair of two-
side-operation connectors for control of raking width.
Connect the machine's lighting cables to the tractor and check the lights for operation.
Connect PTO shaft. If need be shorten the shaft as given in section 5.3.1.
Fig. 6.
Connecting the rake to the tractor
After the rake has been attached to tractor, check the balance and steerability of tractor - rake
set. In order to perform this, calculate to formulas given in the appendix or weigh the set, and
then drive on the scales only with front axis of the tractor. If the pressure on the front axis is at
least 20% of the whole set’s pressure, it means the set is stable. Otherwise, front axis should be
balanced.
5.2. Preparing the rake for transport
CAUTION:
Switching the machine from working to transport position, and the other way
round can only be done on an even and stable ground. Prior to starting any
works make sure that nearby the machine there are no unauthorized persons
exposed to being crushed.