76 / 80
● Make sure that the protective conductor system for the in-house electrical installation is installed
according to regulations.
● An electrical main switch must be installed upstream and must be easily accessible. The switch
must reliably disconnect and isolate the appliance from the electrical system. The contact
opening must be at least 3 mm.
● Inform the operating company and the operating personnel of the location of the main switch in
the building to ensure that the appliance can be switched off safely in the event of hazards to
operators.
● Set the appliance's rotary switch to off before activating the mains power supply.
● For appliances with power plugs, the power socket must be easily accessible.
15.8
Connecting to an energy optimisation unit (optional)
Wiring diagram example
Control assembly PCB
● If the "Energy optimisation connection"
option is purchased, the appliance is fitted
with the necessary interface (ABCD in
terface) at the factory.
‒ A = Appliance switched on
‒ B = Appliance is heating
‒ C = Request (energy optimisation unit)
‒ D = Neutral conductor (N)
● An energy optimisation unit must be
connected by an electrical technician or the
authorised Customer Service.
● Consult the wiring diagram.
15.9
Connecting to a load-shedding unit (optional)
‒ Load-shedding units switch off power to consumers in the event of power peaks.
‒ If switched off by the load-shedding unit, the cooking chamber heater is switched off.
‒ Any ongoing heating and cooking operations are not taken into account.
Connection
● A load-shedding unit must be connected by a qualified electrician or the authorised Customer
Service.
Summary of Contents for VitalityEVO-Easy
Page 79: ...79 80 ...