
6.4 Electrical
Complete booth assembly and then perform steps 1-5 below to connect electrical service to motor.
1.
Determine voltage at your facility.
RTT
does not recommend using 120V single phase on motors
above
1HP.
2.
If a control panel or motor starter was ordered with this booth, confirm that the voltage and phase on the
control panel matches the voltage and phase you intend to use.
3.
Locate the wiring diagram inside the control panel that matches your voltage, phase, and HP.
4.
Some motors may have 2 additional red wires. These wires are for an internal thermal overload. We do not
use these wires and they should be capped off with wire nuts or electrical tape.
5.
Locate the rotation arrow on the fan and verify belts are rotating in the direction of the arrow. If the belts are
not rotating in the direction of the arrow, reverse the motor.
6.
To insure proper wiring refer to motor nameplate for wiring diagram.
Prevent serious injury or death.
Electrical installations must be performed by qualified
electricians.
Installation must conform to all national, local, and
provincial codes and standards.
WARNING
40