M0720-1 ver 3.4
27
4.1.3 Every six-months or after every 250,000 tool changes
The f ollowing maintenance activities should be carried out every six-months or af ter every 250,000 tool
changes, whichever comes f irst.
Activity
Equipment
Description
Cleaning
and
lubrication
Tool changer
Locking balls
Clean locking balls and add new
lubrication, (see section 4.2.5).
Guide pins
Clean guide pins and add new
lubrication (see section 4.2.5).
Spring-loaded pins
Clean spring-loaded signal pins (section
4.2.5).
Servo power sockets
Clean around the sockets and add new
lubrication (see section 4.2.5).
Weld power sockets
Add new lubrication in weld power
sockets (see section 4.2.5).
Tool attachment
Locking cavities
Wipe cavities of locking balls clean
(section 4.2.6).
Guide bushings
Clean guide pin bushings and add new
lubrication (see section 4.2.6).
Servo power pins
Clean servo power pins and add new
lubrication (section 4.2.6).
Weld power pins
Clean weld power pins (section 4.2.6).
4.1.4 To replace when damaged or worn-out
Equipment
Description
Tool changer
Dampers
See section 6.3.1
Guide pins
See section 6.3.2
Spring-loaded signal pins
See section 6.3.4
Water/air couplings
See section 6.3.5
Weld power sockets
See section 6.3.6
Air sealings
See section 6.3.8
Electric modules
See section 6.3.10
Water/air modules
See section 6.3.11
Tool attachment
Guide bushings
See section 6.3.3
Water/air couplings
See section 6.3.5
Weld power pins
See section 6.3.7
Air sealings
See section 6.3.8
O-rings
See section 6.3.9
Electric modules
See section 6.3.10
Water/air modules
See section 6.3.11
Summary of Contents for M0720-1
Page 2: ...2 M0720 1 ver 3 4 ...
Page 63: ...M0720 1 ver 3 4 63 ...
Page 64: ...64 M0720 1 ver 3 4 ...