
OPTIMAX - INSTALLATION INSTRUCTIONS
ROXELL - 004 - 2414
III- 8
TO INSTALL THE FEEDER LINE
Slide a tube clamp over each socket.
Make a row at the spot where you will suspend the tubes.
100kg) hopper.
FIGURE 11.
Put the tubes with the pans on the floor. Tube sockets pointed towards the 100kg hopper.
Install an anchor bracket next to the hopper and the control unit and every two tubes.
Install the intermediate control (optional) at the desired location.
Put the bolt connection on top. This is particularly important when
using the winch system : the cable goes through the hole.
ATTENTION : All holes well aligned and pointing straight downwards.
Connect the tubes : push each tube as far as possible into the socket of the next tube.
100kg
hopper.
FIGURE 12.
Postpone tightening the tube clamps until the
feeder liine has been leveled !
Slots horizontally.
Drop hole
INSTALL AN ANCHOR BRACKET EV-
ERY 3 TUBES.
TO INSTALL THE INTERMEDIATE CONTROL (OPTION)
FIGURE 13.
Control Unit
100kg hopper
Handy box
The intermediate control replaces a pan on the feeder
line.
It is installed in such a way that the switch is located
facing the hopper.
Level Switch
Summary of Contents for Optimax
Page 8: ......
Page 9: ...I 1 PART I INSTRUCTIONS FOR THE USER ...
Page 10: ...OPTIMAX INSTRUCTIONS FOR THE USER ROXELL 004 2111 I 2 ...
Page 24: ...ROXELL 004 2414 OPTIMAX COMPONENTS II 2 GENERAL LAY OUT ...
Page 53: ...III 1 PART III INSTALLATION INSTRUCTIONS ...
Page 54: ...OPTIMAX INSTALLATION INSTRUCTIONS ROXELL 004 3503 III 2 NOTES ...
Page 56: ...OPTIMAX INSTALLATION INSTRUCTIONS ROXELL 004 2414 III 2 GENERAL LAY OUT ...
Page 91: ......