90
User manual
Hydrobox module AQMS80X1i
EN
PART 2. INSTALLATION MANUAL
6. The layout of power line and signal line shall be neat, reasonable and not interfere with each other, and shall not
be connected with connecting pipe and valve body Touch. Generally, it is not allowed to connect two wires unless
the joints are firmly welded and wrapped with insulating tape.
7. After all wiring construction is completed, the power supply can only be connected after careful inspection.
7.5.1. Power Specifications
Indoor Power Supply Specifications
Model (Btu/h)
42K
Power
Phase
1 Phase
Volt
220-240V
Circuit breaker/fuse (A)
32
8. AIR EVACUATION
8.1. Preparations and Precautions
Air and foreign matter in the refrigerant circuit can cause abnormal rises in pressure, which can damage the air
conditioner, reduce its efficiency, and cause injury. Use a vacuum pump and manifold gauge to evacuate the
refrigerant circuit, removing any non-condensable gas and moisture from the system.
Evacuation should be performed upon initial installation and when unit is relocated.
BEFORE PERFORMING EVACUATION
D
Check to make sure the connective pipes between the indoor and outdoor units are connected properly .
D
Check to make sure all wiring is connected properly.
8.2. Evacuation Instructions
1. Connect the charge hose of the manifold gauge to service port on the outdoor unit’s low pressure valve.
2. Connect another charge hose from the manifold gauge to the vacuum pump.
3. Open the Low Pressure side of the manifold gauge. Keep the High Pressure side closed.
4. Turn on the vacuum pump to evacuate the system.
5. Run the vacuum for at least 15 minutes, or until the Compound Meter reads -76cmHG (-105Pa).
Manifold Gauge
Compound
gauge
-76cmHg
Low pressure
valve
High pressure
valve
Pressure hose /
Charge hose
Charge hose
V
acuum
pump
Pressure gauge
Low pressure valve