81
User manual
Hydrobox module AQMS80X1i
EN
PART 2. INSTALLATION MANUAL
DO NOT DEFORM PIPE WHILE CUTTING
Be extra careful not to damage, dent, or deform the pipe while cutting. This will drastically reduce the
heating efficiency of the unit.
Step 2: Remove burrs
Burrs can affect the air-tight seal of refrigerant piping
connection. They must be completely removed.
1. Hold the pipe at a downward angle to prevent burrs
from falling into the pipe.
2. Using a reamer or deburring tool, remove all burrs
from the cut section of the pipe.
Pipe
Point down
Reamer
Step 3: Flare pipe ends
Proper flaring is essential to achieve an airtight seal.
1. After removing burrs from cut pipe, seal the ends with PVC tape to prevent foreign materials from entering
the pipe.
2. Sheath the pipe with insulating material.
3. Place flare nuts on both ends of pipe.
Make sure they are facing in the right direction, because you can’t put them on or change their direction
after flaring.
4. Remove PVC tape from ends of pipe when ready to perform flaring work.
5. Clamp flare form on the end of the pipe. The end of the pipe must extend beyond the flare form.
Flare nut
Copper pipe
Put the copper nut anti
disassembly cap after the
connector is locked
Lock the connector
with a copper nut anti
disassembly
Flare form
Pipe