10
▋
System Startup & Operation
System Operation Notes
1.
Ensure that incoming water pressure is a minimum of 35kPa (5psi).
2.
Check that your incoming water supply flow rate is sufficient for your particular model
3.
Check that the available power supply matches your unit requirements.
4.
Re-check all installation instructions and that all plumbing and electrical connections have been
made correctly and are secure.
Step1
Switch the power in the front side to "
I
" (ON). This will
open the inlet solenoid valve and allow pressurized
feed water to enter the filter housing and the RO
system.
Step 2
Release the breather valve to close it by pressing and
holding the breather valve on top of the Pre-filter cap to
release any air pressure that may have built up in the
system, until water springs from the breather valve.
This step usually only needs to be performed at the first
start-up, or when you find there may have air entering the
system.
Notice!
If there is air in the RO system, the long-term
accumulation may easily cause damage to the pump.
Step 3
Once the system is running, it automatically initiates a
20-second start-up flush. Then it continues to produce
pure water until the pure water tank is full "FUL", and the
water production will stop.
Also, if the water inlet pressure is lower than the default,
the system will stop
water production
, too.
If the water inlet detects low pressure and displays
"LO", the system will also enter system protection and
stop water production.
Please refer to the chapter "C5TM RO Controller".
Breather
Valve