11.
Installation
27
Disconnect the cable from the 400 V terminal on
the transformer and connect it to the 230 V
terminal.
Remove the cover of the motor terminal box.
Loosen the M5 lock nuts on the terminal strip
and change its position (Fig. 23)
Tighten the M5 lock nuts again and replace the
terminal box cover.
To prevent any danger arising from the power
supply, tighten the control unit cover before
connecting the control unit to the power supply.
To prevent use of the lift by an unauthorised
member of the staff, lock the main switch of the
control unit.
Connect the control unit to the power supply.
23
CAUTION
Grounding
The ground connector is essential to proper
operation of the lift.
NEVER ground to gas, water, telephone, or
other lines which are not expressly intended
for grounding.
11.5 Final assembly of the
mechanical unit
a) Installing the synchronisation cables
The synchronisation cables and the lock
cable are fully installed with the columns in an
upright position.
To do so, the slider blocks must be set up at
the same height in the centre of the vertical
travel and engage the rack teeth.
Now go back to Figure.
Fehler!
Verweisquelle konnte nicht gefunden
werden.
and proceed as follows:
Check that the cable is properly routed. Fit the
short cable clamp of the metal cable (Pos. 95)
to the slider block with a washer (Pos. 96) and a
self-locking nut (Pos. 97).
Repeat this procedure on the opposite column.
Take the long cable clamp and fit it with a
washer and a self-locking nut.
Do the same with the second cable.
Carry out a final adjustment as per section 12 to
check that the two cables are equally tensioned.
b) Assembling the latch mechanism
Assemble the latch mechanisms according to
the drawings on page 42.
i
i
i
Summary of Contents for SGL35M
Page 2: ......
Page 39: ...Diagrams spare parts lists 37 Electrical Circuit Diagram single phase...
Page 40: ...Diagrams spare parts lists 38 Electrical Circuit Diagram 3 phase...
Page 42: ...40...
Page 44: ...Diagrams spare parts lists 42 8 9 2 3 5 4 15 1 14 17 7 18 6 16 11 12 10 26 13 11...
Page 45: ...Figure 2 43...
Page 46: ...Diagrams spare parts lists Figure 3 Figure 4 44...
Page 47: ...Figure 5 Figure 7 Figure 6 45 54 57 56 55...
Page 48: ...Diagrams spare parts lists 46 Figure 8...
Page 49: ...Figure 9 47...
Page 50: ...Diagrams spare parts lists 48...