11.
Installation
25
Set up the columns vertically or slightly tilted
outwards with the help of a plumb line. If the
floor is not level, use the supplied shims under
the columns to align them.
h
c
n
i
"
4
/
3
f
o
r
e
t
e
m
a
i
d
a
h
t
i
w
s
e
l
o
h
g
n
i
t
n
u
o
m
e
h
T
are drilled with the help of a hammer drill. Use
the drill template in the column base plates as a
guide (Fig. 21). Please also refer to the adjacent
table and work instruction in Fig. 22.
21
Drill diameter 3/4" inch
Recommended concrete
thickness
200 mm
Drilling depth A
140 mm
Anchoring depth C
105 mm
Anchor bolt
Quantity
min. 5 per column
Type
3/4"*7" inch
Tightening torque
200 Nm
Minimum distance to edge of
foundation slab
100 mm
If the required tightening torque cannot be
reached, either the hole is too large and the
thickness or the compression strength is too
low.
20
Short cable clamp
Cable clamp
Latch
Secondary column
Anchor
Long cable clamp
Mounting plate
Primary
column
Cable clamp
Latch
Summary of Contents for SGL35M
Page 2: ......
Page 39: ...Diagrams spare parts lists 37 Electrical Circuit Diagram single phase...
Page 40: ...Diagrams spare parts lists 38 Electrical Circuit Diagram 3 phase...
Page 42: ...40...
Page 44: ...Diagrams spare parts lists 42 8 9 2 3 5 4 15 1 14 17 7 18 6 16 11 12 10 26 13 11...
Page 45: ...Figure 2 43...
Page 46: ...Diagrams spare parts lists Figure 3 Figure 4 44...
Page 47: ...Figure 5 Figure 7 Figure 6 45 54 57 56 55...
Page 48: ...Diagrams spare parts lists 46 Figure 8...
Page 49: ...Figure 9 47...
Page 50: ...Diagrams spare parts lists 48...