11.
Installation
28
c) Assembling the latch cable
To make this step easier, raise the slider
block to the top position.
Feed the end of the cable into the latch control
cable clamp on the primary column and tighten
the clamp (see Fig.
Fehler! Verweisquelle
konnte nicht gefunden werden.
).
Feed the other end of the cable upwards
through the sheave to the latch cable clamp of
the secondary column.
The control cable is routed in the column.
Screw the mechanical safety lever onto the
primary column latch.
Adjust the tension of the cable with the clamp so
that both latches disengage from their rack at
the same time when you pull the latch
mechanism lever.
d) Assembling the arm
24
i
i
For part No.105 , this side fit into cylinder
•
•
•
•
Summary of Contents for SGL35M
Page 2: ......
Page 39: ...Diagrams spare parts lists 37 Electrical Circuit Diagram single phase...
Page 40: ...Diagrams spare parts lists 38 Electrical Circuit Diagram 3 phase...
Page 42: ...40...
Page 44: ...Diagrams spare parts lists 42 8 9 2 3 5 4 15 1 14 17 7 18 6 16 11 12 10 26 13 11...
Page 45: ...Figure 2 43...
Page 46: ...Diagrams spare parts lists Figure 3 Figure 4 44...
Page 47: ...Figure 5 Figure 7 Figure 6 45 54 57 56 55...
Page 48: ...Diagrams spare parts lists 46 Figure 8...
Page 49: ...Figure 9 47...
Page 50: ...Diagrams spare parts lists 48...