![Rohde & Schwarz ZND Getting Started Download Page 33](http://html.mh-extra.com/html/rohde-and-schwarz/znd/znd_getting-started_1477890033.webp)
Operating the instrument
R&S
®
ZND
33
Getting Started 1316.2407.02 ─ 62
left = unidirectional R&S
ZND
right = bidirectional R&S
ZND
2. Activate the desired softtool tab, e.g. "Z←Sij".
left = unidirectional R&S
ZND
right = bidirectional R&S
ZND
3. Select a control element, e.g. "Z←S11".
The diagram immediately reflects your selection. The active trace shows the mea-
surement results for the selected measured quantity.
A control element with three dots (e.g. SYSTEM – [SETUP] > "Setup" > "System Con-
fig...") opens a dialog, containing a group of related settings, a wizard or additional
information.
Manual operation