
Switching On or Off the Instrument
R&S
®
ETL
45
Getting Started 2118.4130.02 ─ 04
A list with hardware and firmware information is displayed.
5. Check the availability of the hardware options as indicated in the delivery note.
6. Check the options enabled using license keys as indicated in the delivery note.
For an overview of the all options available for the R&S
ETL, refer to the product site
at:
https://www.rohde-schwarz.com/product/etl/
7.6
Turn-On Tests
Only perform these functional tests when the operating temperature is reached
(approx. 15
minutes after the R&S
ETL is switched on, refer to the data sheet for
details).
7.6.1
Performing a Self-Alignment
1. Press the [SETUP] key.
2. Press the "Alignment" softkey.
3. Press the "Self Alignment" softkey.
Once the system correction values have been calculated successfully, a message
is displayed.
7.6.2
Performing a Self-Test
1. Press the [SETUP] key.
2. Press the "More
↓
" key.
3. Press the "Service" softkey.
4. Press the "Selftest" softkey.
Once the modules have been checked successfully, a message is displayed.
Once both steps have been completed successfully, the R&S
ETL is ready for
operation.
You do not need to repeat the self-test every time you switch on the R&S
ETL. It is only
necessary if instrument malfunction is suspected.
Turn-On Tests