192
Rockwell Automation Publication 750-TG101A-EN-P - June 2022
Index
power interface circuit board (frame 6)
install
remove
power interface circuit board (frame 7)
install
remove
power terminal block
frame 1
frame 2
frame 3
frame 4
frame 5
frame 6
frame 7
power terminal cover (frames 1…5)
install
remove
,
precautions
predictive maintenance
protective guard (frame 6)
install
remove
protective guard (frame 7)
install
remove
R
remove
AC precharge circuit board (frame 6)
AC precharge circuit board (frame 7)
backplane circuit board (frame 1)
backplane circuit board (frame 6)
backplane circuit board (frame 7)
backplane circuit board (frames 2…5)
chassis (frame 1)
chassis (frames 2…5)
control pod access cover (frame 6)
control pod access cover (frame 7)
control pod fan (frames 2…5)
cover (frame 6)
DC precharge circuit board (frame 6)
DC precharge circuit board (frame 7)
drive cover (frame 6)
drive cover (frame 7)
flange gasket (frame 6)
flange gasket (frame 7)
flange gasket (frames 2…5)
heatsink fan (frame 6)
heatsink fan (frame 7)
heatsink fan (frames 1…3)
heatsink fan (frames 4 and 5)
HIM cradle (frame 6)
HIM cradle (frame 7)
HIM cradle (frames 2…5)
IP20, NEMA/UL Type Open cover (frame 7)
IP54, NEMA/UL Type 12 cover (frames 2...5)
IP54, NEMA/UL Type 12 cover (frames 2…5)
lower stirring fan (frame 6)
main control circuit board (frame 1)
main control circuit board (frame 6)
main control circuit board (frame 7)
main control circuit board (frames 2…5)
power interface circuit board (frame 6)
power interface circuit board (frame 7)
power terminal cover (frames 1…5)
,
protective guard (frame 6)
protective guard (frame 7)
ribbon cable, main control board to power
interface board (frame 1)
ribbon cable, main control board to power
interface board (frame 6)
ribbon cable, main control board to power
interface board (frame 7)
ribbon cable, main control board to power
interface board (frames 2…5)
stirring fan (frame 7)
stirring fan (frames 4 and 5)
upper stirring fan (frame 6)
remove power from a drive
replacement
pilot light
reverse biased diode test
meter reading
ribbon cable, main control board to power
interface board (frame 1)
install
remove
ribbon cable, main control board to power
interface board (frame 6)
install
remove
ribbon cable, main control board to power
interface board (frame 7)
install
remove
ribbon cable, main control board to power
interface board (frames 2…5)
install
remove
S
schematics
sequence number
diagram
software
Connected Components Workbench
startup
after repairs
stirring fan (frame 7)
install
remove
stirring fan (frames 4 and 5)
install
remove
T
terminal
inspect
test
dielectric withstand voltage
insulation resistance
tool size
diagram
tool type
diagram
tools
recommended