background image

 

10

 

 

 

 

 

Technical specifications). In cases of too much draught, when the duct exceeds 7 meters in length, or the measurement exceeds 20 
Pa, the draft must be adjusted. To do this, use the second part of the baffle plate. 

2.3 Type of appliance. 

Fireplace with vermiculite plates in the bottom, sides and baffle plate, grill embers and ash tray. The device 

is ready to install. The entire interior and the door assembly can be removed if necessary, to make it easier to transport and install. 

2.4. Insulating procedures.  
2.4.1. Apparatus insulation. 

The fireplace must be insulated with insulation panels (Type A-1, EN13501-1) on its sides, back and 

upper part.

  

2.4.2 Fireplace room insulation.

 It is also convenient to use insulation panels on the inner walls of the fireplace (Type A-1, EN13501-

1). 

2.5. Safety distances

. You must be respected the values described in 1.1 Technical characteristics 

2.5.1. Inner fireplace room safety distances.  

You must be respected the values described in 1.1 Technical characteristics.

 

2.5.2. Outer fireplace safety distances.

 Anything fragile or flammable (textile, electronics, wood, paper wall, glass, chalk…) should 

be separated of the appliance and respected the safety distances described in 1.1 Technical characteristics.  

We must take special care in those fireplaces with wooden shelves or similar: we must prevent and avoid the possibility of hot air that 
expels the device falls directly on the wood, in these cases, flammable items should be properly insulated. 

2.6 Fireplace room.

 Fireplace room must be built with non-combustible materials and should not rest on the apparatus and the points 

of contact (such as the front frame see picture B.4 of the ANNEXED DOCUMENT). Inside should not contain flammable or fragile 
materials such as wood, wallpaper, glass, chalk paper, etc.). 

2.7. Ventilation.

 It is imperative that the niche where the appliance is installed ventilation available. 

2.7.1. Fireplace room ventilation.

 The appliance must be provided with an air outlet or inlet diffusers for sufficient air flow as 

described in Technical characteristics. 
Indicative ventilation table (practicable diffuser (C4000) is equivalent to on inlnet): 

 

Minimum inlet diffuser 

Minimum exit diffuser 

 

Without optional 

ventilation unit 

With optional 

ventilation unit 

Without optional 

ventilation unit 

With optional 

ventilation unit 

G 450 TC 

G 450 TC +Plus 250 

The approximate length of the convection ducts is: 

Number of outlets 

connected 

Maximum length * (m) 

Without optional ventilation unit 

With optional ventilation unit

 

Vertical 

Horizontal 

Vertical 

Horizontal 

12 

11 

1,5 

10 

* The length is using Ø120 mm smooth insulated tube and a wide radius elbow, if flexible, non-insulated conduits are used and / or 
there are more elbows, the distance may be affected. 

2.7.2 Air supply.

 Air should be provided to the room where the appliance is installed. This is especially relevant when outside air is 

not used and also when the door is opened for reloading with logs. This entry cannot be less than 225 cm

2

. Also note the simultaneous 

operation with other ventilation devices and / or heating such as exhaust fans, heat pumps, etc. In these cases, the extraction must 
be compensated with a corresponding air entry from outside. 
If ventilation unit is used, the external air intake must be connected, if it is not possible to take air from outside, it can be connected 
to a diffuser of one exit (D1001) installed as an inlet diffuser. 

2.8 Changes to the device. 

Any intended change to the equipment must be authorized in writing by Manufacturas Rocal, S.A. We 

also recommend using only original spare parts or parts recommended by Manufacturas Rocal, S.A. 

 

 

3.1  Installation  process. 

To  proceed  with  the  installation,  follow  the  steps  outlined  in  Section  III  of  the  ANNEXED  document. 

WARNING:

 

The third deflector plate should be adjusted in case of draught excess, to procede follow the steps: “C.11” to “C.15”. If 

the ventilation kit is not used, the convection precuts located in the galvanized sump base image “C.17” must be opened. 

Important:

 Before closing the fireplace room where the device will be located check that all mechanisms work correctly. 

For the painting and finishing of the firebox enclosure, tapes or protectors are used for areas that are not painted, these tapes 
MUST NOT TOUCH THE SHEET OF THE APPLIANCE in any case to prevent that the painting might peel off when removing this 
tapes or protectors. 

 

 

4.1 Fuels authorized by the manufacturer.

 The appliance should not be used as an incinerator and the use of fuels other than 

those authorized by the manufacturer are prohibited, including lighting liquids or gels. Only natural wood logs are authorized as fuel 

and 

it is not advisable to use resinous woods. 

 

4.2 Efficient combustion

. During combustion the flame should not be extinguished, in this case the unburned gases produce 

corrosion, dirt in the duct and polluting gases. The air controls must be opened, particularly the secondary one. 

3. INSTALLATION 

4. USE AND OPERATION 

CAUTION: 

- The maximum load allowed by the manufacturer, the measurements of the logs and the height of the 
reload must be respected. 
- Do not touch or manipulate any part of the appliance when in operation without a protection glove. 
- Check that there are no materials left inside the device, paying special attention to the paint spray.

 

Summary of Contents for G 450 TC

Page 1: ...8380 G 450 TC G 450 TC Plus 250 MANUAL DE CARACTERISTICAS INSTALACION Y FUNCIONAMIENTO USER S GUIDE ON CHARACTERISTICS ASSEMBLY AND OPERATING MANUEL DES CARACTERISTIQUES INSTALLATION ET FONCTIONNEMENT...

Page 2: ...oy your purchase L quipe de Rocal vous remercie pour votre confiance en nous et pour choisir un de nos produits Profitez de votre achat Il team di Rocal La ringrazia per la fiducia accordataci e per a...

Page 3: ...ntrol de la combusti n 5 4 4 1 Registro primario 5 4 4 2 Registro secundario 5 4 4 3 Aire terciario o de seguridad 5 4 5 Encendido 5 4 6 Carga y recarga de combustible 5 4 7 Apertura de la puerta 5 4...

Page 4: ...Certificado 1880 CPR 035 20 1880 CPR 037 20 1 2 Detalle de los componentes de entrega Compruebe que dispone de todos los componentes descritos a continuaci n en relaci n a la imagen del apartado II d...

Page 5: ...e 2 6 Nicho del hogar El nicho de hogar debe construirse con materiales incombustibles y no debe descansar encima del aparato ni en los puntos de contacto como por ejemplo el marco frontal imagen B 4...

Page 6: ...e La recarga debe efectuarse cuando la llama se apague y solo queden ascuas No debe superarse la C M A carga m xima autorizada ni en la carga ni en la recarga V ase tabla de Caracter sticas t cnicas 4...

Page 7: ...a los pasos descritos en la imagen C 16 si dispone de Plus 250 5 2 4 Pintura La pintura antical rica que reviste todo el aparato la c mara de combusti n el interior la puerta frontal el marco tapa jun...

Page 8: ...a de Combusti n del aparato Esperar que el proceso de polimerizaci n de la pintura finalice esto puede tardar de uno a varios encendidos Revisi n de materiales aislantes tales como fibra de vidrio mad...

Page 9: ...hting 11 4 4 Combustion control 11 4 4 1 Primary register 11 4 4 2 Secondary register 11 4 4 3 Tertiary or safety air 11 4 5 Fire lighting 11 4 6 Loading and reloading of fuel 11 4 7 Door opening 11 4...

Page 10: ...mm 4 7x 120 mm aluminium ring 5 4x Levelling and adjustable foots 6 Documentation bag output declaration energy label guarantee technical sheet and installation and operating characteristics manual 7...

Page 11: ...12 9 3 5 2 11 7 4 4 1 5 10 6 5 4 1 8 5 6 3 1 6 4 The length is using 120 mm smooth insulated tube and a wide radius elbow if flexible non insulated conduits are used and or there are more elbows the d...

Page 12: ...cts and installation Thus for your safety and comfort some of our dealers offer a servicing contract for your device Please contact your dealer for this service 5 1 1 Locking mechanisms You need to ma...

Page 13: ...irst lighting Flammable or combustible items in the enclosure or surrounding walls of the equipment Crack in the combustion chamber of the equipment Wait for the polymerization process of the paint to...

Page 14: ...e de la combustion 16 4 4 1 Registre primaire 16 4 4 2 Registre secondaire 16 4 4 3 Tertiaire ou air de s curit 16 4 5 Allumage 16 4 6 Chargement et rechargement de combustible 16 4 7 Ouverture de la...

Page 15: ...R 037 20 1 2 D tail des composants de livraison V rifiez que vous disposez de tous les l ments d crits ci dessous qui figurent sur l image du paragraphe II du document ANNEXE 1 Corps de la chemin e 2...

Page 16: ...verre papier de craie etc 2 7 Ventilation Il est imp ratif que la niche o l appareil est install ventilation disponible 2 7 1 Ventilation du caisson Il convient de pr voir la mise en place de ouvertu...

Page 17: ...rte r glez le registre primaire afin d viter une combustion excessive et contr lez l intensit du feu l aide du registre secondaire 4 6 Chargement et rechargement de combustible Le chargement maximal a...

Page 18: ...et C 5 ou C 6 du document ANNEXE 5 2 3 Conduit de fum es Il est important d liminer toute sorte de r sidu dans le conduit d vacuation des fum es Les salet s qui s accumulent dans celui ci peuvent tre...

Page 19: ...chambre de combustion de l appareil Attendre que le processus de polym risation de la peinture se termine ce qui peut durer de un plusieurs allumages Examiner les mat riaux isolants tels que la fibre...

Page 20: ...ione 22 4 4 1 Registro primario 22 4 4 2 Registro secondario 22 4 4 3 Terziario o aria di sicurezza 22 4 5 Accensione 22 4 6 Carica e ricarica di combustibile 22 4 7 Apertura de la puerta 22 4 8 Funzi...

Page 21: ...SOTTO COPERTINA Anno Certificazione 2020 2020 N del certificato 1880 CPR 035 20 1880 CPR 037 20 1 2 Dettaglio dei componenti di consegna Verificate che siano presenti tutti i componenti di seguito des...

Page 22: ...al caso necessario un isolamento adeguato 2 6 Nicchia del focolare La nicchia del focolare deve essere realizzata con materiali non combustibili e non deve appoggiare sull apparecchio o nei punti di c...

Page 23: ...a che nella ricarica Vedi tabella di Specifiche tecniche 4 7 Apertura de la puerta Si deve soltanto aprire per fare la ricarica Per l e apertura seguite i passi descritti nelle immagini C 1 A o C 1 B...

Page 24: ...magini C 11 a C 14 seguite i passi nella immagini C 16 se hai Plus 250 5 2 4 Vernice La vernice termoresistente che riveste tutto l apparecchio la camera di combustione l interno lo sportello frontale...

Page 25: ...amera di Combustione dell impianto Aspettare finche il processo di polimerizzazione della vernice sar finito per questo possono essere necessarie una o pi accensioni Controllo di materiali isolanti co...

Page 26: ...role de combust o 28 4 4 1 Registro prim rio 28 4 4 2 Registro secundario 28 4 4 3 Ar terci rio ou de seguran a 28 4 5 Igni o 28 4 6 Carregamento e reabastecimento 28 4 7 Apertura de la puerta 28 4 8...

Page 27: ...XO COBERTO Ano de certifica o 2020 2020 N mero de certifica o 1880 CPR 035 20 1880 CPR 037 20 1 2 Detalhe componentes de entrega Certifique se de que voc tem todos os componentes descritos abaixo com...

Page 28: ...u em pontos de contato como a estrutura frontal veja imagem B 2 do documento Anexado 2 7 Ventila o imperativo que o nicho onde o aparelho est instalado de ventila o dispon veis 2 7 1 Ventila o de nich...

Page 29: ...e deixar o aparelho apagar se 4 9 Preven o de inc ndios Nenhum elemento deve inflam vel dentro da dist ncia de seguran a descritos na tabela na sec o 1 1 Caracter sticas t cnicas apontam do dispositi...

Page 30: ...da por combust veis l quidos n o autorizados pelo fabricante etc Neste caso necess rio repintar todas as reas danificadas antes do per odo de paralisa o prolongada do equipamento Utilize exclusivament...

Page 31: ...ra de combust o ou nas proximidades Rachadura na c mara de combust o do aparelho Espere que o processo de polimeriza o depintura esteja conclu do Isso pode necessitar de v rios acendimentos Revis o do...

Page 32: ...82 Performance 85 4 Particle concentration 17 6 mg Nm3 Particle concentration 17 1 mg Nm3 NOx concentration at 13 of O2 101 mg Nm3 NOx concentration at 13 of O2 101 mg Nm3 OGC concentration at 13 of...

Page 33: ......

Page 34: ...1 ANEXO ANNEX ANNEXE ANESSO I G 450 TC...

Page 35: ...2 I G 450 TC Plus 250...

Page 36: ...3 II 1 11 13 10 4 2 5 3 6 7 8 9 12...

Page 37: ...4 III 1 2...

Page 38: ...5 III 1 2 3 4 5 6...

Page 39: ...6 III 7 8 9 9 1 Plus 250 9 2 Plus 250 10...

Page 40: ...7 III A 1 A 2 A 3 B 1 B 1 B 2...

Page 41: ...8 III B 3 B 4...

Page 42: ...9 IV C 1 A C 1 B C 2 C 3 C 4 C 5...

Page 43: ...10 IV C 6 C 7 C 8 C 9 C 10 C 11...

Page 44: ...11 IV C 12 C 13 C 14 C 15 C 16 C 17...

Page 45: ...12 IV C 18 C 19...

Page 46: ...E 4 2xM1870 200 1 2xM1870 200 1 5 1xM1870 80BD 1xM1870 80BD 6 7 8 1xVRM1870 6 1xVRM1870 6 9 3xVRM1870 1 3xVRM1870 1 10 3xVRM1870 2 3xVRM1870 2 11 3xVRM1870 8 3xVRM1870 8 12 1xVRM1870 7 1xVRM1870 7 13...

Page 47: ...14 NOTES...

Page 48: ...1...

Reviews: