
July 2022
© RLS Wacon analytics GmbH +49 (0)5121 281260
Pag
e
50
Subject to
change without notice
Configuration
Reagent
Has a full reagent bottle been used?
Select [Yes] or [No] with [
◀
] and [
▶
]
confirm with [OK].
[Yes] The bottle level is set to 100 %.
[No] The previous bottle filling level in % is retained.
If a sample cooler is used, check the proper operation of the sample cooler
before the next step in order to exclude a hazard from hot steam or hot
water.
Flush
Press OK to flush the supply line and measuring chamber.
Press the [OK] key.
Flush
The solenoid valve opens and flushes the measuring chamber.
The flushing time that has elapsed so far is shown in the
display. This can be used as a reference time to set the
flushing time before an analysis.
The flushing process is terminated with the [OK] key. The
solenoid valve closes.
Make sure that the sample water is clear and free of bubbles.