July 2022
© RLS Wacon analytics GmbH +49 (0)5121 281260
Pag
e
18
Subject to
change without notice
Electrical installation
Voltage
Work on electrical connections may only be carried out by authorised
specialist personnel in compliance with the current regulations. All lines must
be de-energised.
Open the cover of the control unit by loosening the four screws in the corners of the cover.
Illustration 8: Back of the cover
Position
Description
D
Display connection
L
SD card socket
M
Sound signal generator