Table of contents
26
7. Life phases
7.1 Lifting column scope of delivery............................................................................... 37
7.2 Transport and storage .............................................................................................. 37
7.3 Important information on installation and putting into service ........................... 38
7.3.1 Synchronous operation of lifting columns .................................................. 39
7.3.2 Different heights ........................................................................................... 39
7.3.3 Parallel alignment ......................................................................................... 39
7.3.4 Bends in the table frames ............................................................................. 39
7.3.5 The ideal configuration ................................................................................ 40
7.3.6 Load distribution ........................................................................................... 41
7.4 Installation ................................................................................................................ 41
7.4.1
RK
Slim
lift
...................................................................................................... 41
7.4.2
RK
Slim
lift EM
............................................................................................... 42
7.5 Connecting the controller / hand switch ................................................................. 43
7.5.1 Operating the external controller ............................................................... 43
7.5.2 Wiring of the lifting column......................................................................... 44
7.6 Putting the lifting column into operation .............................................................. 45
7.7 Maintenance ............................................................................................................. 46
7.7.1 Maintenance of the lifting column ............................................................. 46
7.7.2 Maintenance of the hand switch ................................................................ 46
7.8 Cleaning .................................................................................................................... 46
7.9 Disposal and return ................................................................................................... 47