Regulations and guidelines
The installation must comply to the requirements of the authority having jurisdiction
or, in the absence of such requirements, to the latest edition of the National Fuel Gas
Code, ANSI Z223.1/NFPA 54. In Canada, installation must be in accordance with
the requirements of CAN/CSA B149.1, Natural Gas and Propane Installation Code.
Where required by the authority having jurisdiction, the installation must comply to
the Standard for Controls and Safety Devices for Automatically Fired Boilers, ANSI/
ASME CSD-1.
Install CO detectors per local regulations. Boiler requires an inspection every 2 years
and maintenance every 4 years or 4000 hours. See maintenance section chapter 14.
Operating Limits of the boiler:
Max. boiler temperature: 176 °F (80 °C)
Max. operating pressure: 45 psi (3 bar)
Max Allowable Working Temperature ASME: 200 °F (93 °C)
Max. Allowable Working Pressure ASME: 45 psi (3 bar)
The hot water distribution system must comply with all applicable codes and
regulations. When replacing an existing boiler, it is important to check the condition
of the entire hot water distribution system to ensure safe operation.
Summary of Contents for Q130SN
Page 18: ...Installation Servicing Instructions Rinnai Q Series 18 Boiler basic piping fig 6 ...
Page 44: ...Installation Servicing Instructions Rinnai Q Series 44 electrical ladder diagram figure 22a ...
Page 99: ...Installation Servicing Instructions Rinnai Q Series 99 ...
Page 119: ...Installation Servicing Instructions Rinnai Q Series 119 ...
Page 120: ......