Installation & Servicing Instructions Rinnai Q-Series
3
Content
1 Safety and general instructions ........................................................4
1.1
Designated use ...................................................................4
1.2
Hazard definitions
................................................................4
1.3
Symbol definitions
...............................................................4
1.4
The following instructions must be followed ........................5
1.5
Follow these instructions for the space heating water .........6
1.6
Tools, materials and additional equipment ..........................6
1.7
Relevant Installation, Service and User manuals ................6
1.8
Disposal ...........................................................................6
2 Regulations and guidelines ..............................................................7
3 Description of the boiler ...................................................................8
4 Packaging and transportation ..........................................................9
4.1
Scope of delivery .................................................................9
4.2
Transportation .....................................................................9
5 Installation
.........................................................................10
5.1
Requirements for the installation room .............................10
5.2
Fitting the boiler .................................................................11
5.3
Dimensions ........................................................................12
5.3.1
Plumbing kits .....................................................................14
5.3.2
Clearances from the boiler ................................................15
5.4
Technical specifications
.....................................................16
6 Connecting the boiler .....................................................................17
6.1
Central heating system ......................................................17
6.1.1
Plumbing kit installation .....................................................19
6.1.2
Safety valve .......................................................................23
6.1.3
Low water cut off ...............................................................23
6.2
Expansion tank ..................................................................23
6.3
Underfloor heating system (plastic pipes)
...........................23
6.4
Gas connection .................................................................24
6.4.1. Gas connection with natural gas .......................................24
6.4.2
Gas connection with propane gas .....................................25
6.5
Hot water supply (Combi boiler Q175CN/Q175CP) ..........26
6.6
Condensate drain pipe ......................................................28
6.7
Vent system and air supply system ...................................29
6.7.1
Intake / Exhaust Guidelines ...............................................29
6.7.2
Examples vent and air supply systems .............................30
6.7.3
Installation of the vent system ...........................................32
6.7.4
Recommended vent/air intake terminal position ...............33
6.7.5
Dimensioning of the exhaust and air intake duct .............35
6.7.6
Combustion air and vent piping lengths ............................36
6.7.7
Calculation of compensation factor ...................................37
6.7.8
Room Air System (indoor combustion air) .........................38
7 External hot water cylinders ...........................................................41
8 Electrical connections ....................................................................42
9 Boiler controls
.........................................................................45
9.1
Explanation of the function buttons ...................................46
10 Starting up: Filling and de-aerating the boiler and installation .......47
10.1
Requirements of the water system ....................................47
10.2
Filling the heating system ..................................................48
10.3
Hot water supply ................................................................49
11 Adjustments
.........................................................................51
11.1
Altering adjustments ..........................................................51
11.2
Activating factory settings (green button function) ...........54
12 Isolating the boiler .........................................................................49
13 Commissioning
.........................................................................55
13.1
Testing for gas leaks ..........................................................56
13.2
Testing the Ignition Safety shut off device .........................56
13.3
Checking for contamination ...............................................57
13.4
Checking the O
2
.................................................................58
13.5
Measuring the ionization current .......................................59
13.6
Installing the casing ...........................................................60
14 Maintenance
.........................................................................60
14.1
Periodic examination of venting and boiler ........................60
14.2
Inspection .........................................................................60
14.3
Maintenance activities .......................................................64
14.4
Warranty .........................................................................64
15 Parts of the boiler .........................................................................65
16 Blocks and errors .........................................................................67
17 Other errors
.........................................................................92
18 Spare parts
.......................................................................101
19 Parts list vent system ...................................................................116
20 Common venting guidelines ..........................................................117
Appendix A Outdoor Reset Sensor Data ......................................118
Summary of Contents for Q130SN
Page 18: ...Installation Servicing Instructions Rinnai Q Series 18 Boiler basic piping fig 6 ...
Page 44: ...Installation Servicing Instructions Rinnai Q Series 44 electrical ladder diagram figure 22a ...
Page 99: ...Installation Servicing Instructions Rinnai Q Series 99 ...
Page 119: ...Installation Servicing Instructions Rinnai Q Series 119 ...
Page 120: ......