Installation & Servicing Instructions Rinnai Q-Series
61
OPEN
The air box
- remove the transparant air box (figure 32);
- clean the box with a cloth with a simple (non-abrasive) cleaning agent;
14.2.1
Visual inspection for general signs of corrosion
-
Check all gas and water pipes for signs of corrosion.
-
Replace any pipes that are corroded.
14.2.2
Measuring the ionization current
See subsection 13.5 “Measuring the ionization current”.
14.2.3
Measuring the inlet gas pressure
See subsection 6.4.1 and .2 “Gas connection with natural gas" and "Gas connection
with propane”.
14.2.4
Testing for gas leaks
See subsection 13.1 “Testing for gas leaks”.
14.2.5
Carrying out a pressure test of the heating system
See chapter 10.2 “Filling the heating system”.
14.2.6
Checking venting systems
Check the following points:
- Is the prescribed combustion air/flue system used?
- Have the instructions for configuring the flue system as specified in the relevant
Installation instruction for the flue gas system been observed?
- Check air intake and flue gas for obstruction or damage.
Opening air box
figure 32
Summary of Contents for Q130SN
Page 18: ...Installation Servicing Instructions Rinnai Q Series 18 Boiler basic piping fig 6 ...
Page 44: ...Installation Servicing Instructions Rinnai Q Series 44 electrical ladder diagram figure 22a ...
Page 99: ...Installation Servicing Instructions Rinnai Q Series 99 ...
Page 119: ...Installation Servicing Instructions Rinnai Q Series 119 ...
Page 120: ......