Installation & Servicing Instructions Rinnai Q-Series
9
4
Packaging and transportation
4.1 Scope of delivery
The boiler is supplied ready for use.
•
Please check if the packaging is intact.
•
Check if all the items listed are included in the delivery.
The supply kit contents:
•
Boiler with casing;
•
Template on inside of package ;
•
Automatic air separator (inside the boiler);
•
Installation instructions;
•
Wall mounting suspension bracket;
•
User manual;
• Bronze adapter fittings;
•
Service manual;
• 3" PP exhaust adapters (x2);
• Outdoor sensor ARV12
• Plumbing kit;
• 3/4" Gas shut off valve
•
Fixing material consisting of plugs and screws;
4.2 Transportation
The boiler may be damaged when not secured properly.
- Only transport the boiler using appropriate transportation equipment, such as a
handtruck with a fastening belt or special equipment for maneuvering steps.
- When shipping the boiler must be secured on the transportation equipment to
prevent it from falling off.
- Protect all parts against impacts if they are to be transported.
- Follow the transportation markings on the packaging.
•
Packaged boilers must always be lifted and carried by two people, or you must
use a handtruck or special equipment for transport.
!
CAUTION
Summary of Contents for Q130SN
Page 18: ...Installation Servicing Instructions Rinnai Q Series 18 Boiler basic piping fig 6 ...
Page 44: ...Installation Servicing Instructions Rinnai Q Series 44 electrical ladder diagram figure 22a ...
Page 99: ...Installation Servicing Instructions Rinnai Q Series 99 ...
Page 119: ...Installation Servicing Instructions Rinnai Q Series 119 ...
Page 120: ......