INSTALLATION
Fastening the frames to each other.
Cascade installation in-line
Cascade installation B2B
3
2
1
NOTE:
For the front configuration, the frame can also be wall mount-
ed.
Proceed as follows:
− trace the fastening points
− drill a hole and insert suitable dowels (not supplied);
− correctly position the frame and introduce but do not
tighten the screws so any necessary adjustments can
be still be made;
− once installation of the entire system has been com-
pleted in cascade, only then can the screws be fully
tightened.