CONFIGURATION OF THE MAIN BLOCK DIAGRAMS
ACCESSORY CONNECTIONS FOR ADDITIONAL ZONE
SAFETY
THERMOSTAT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
ROOM
THERMOSTAT
FLOW
SENSOR
P3
V3
V3
BUS
MIX VALVE
PUMP
L
L L
N
N L
N
P3
P3
Zone 3 circulator (low temperature) (12-13-14)
V3
Mixer valve zone 3 (9-10 closing; 10-11 opening)
9
Some electric connections of the power jig have a double
function. The hot water tank circulator PB must be connect-
ed to the terminals 106-107 of the thermal module config-
ured as the Managing module. The two-way valve V1 of each
thermal module must be connected to terminals 101-102-103
for both the Managing module and the Depending module.
3.7.2
Sensor connections Block diagram 3
MANAGING CONNECTIONS
BUS 2
BUS 1
PWM
SE
SB
SS
Modbus
MANAGING
MO1
0-10V TA
1
2
3
4
9 10 11 12 13 14 15 16 17 18
5 6 7 8
SS
SE
SB
SS
Primary sensor
SB
Boiler sensor
SE
Outdoor sensor
DEPENDING CONNECTIONS
BUS 2
BUS 1
PWM
SE
SB
Modbus
DEPENDING
0-10V TA
1
2
3
4
9 10 11 12 13 14 15 16 17 18
5 6 7 8
SC
MO1
S2
S2
Zone 2 sensor
ACCESSORY CONNECTIONS FOR ADDITIONAL ZONE
SAFETY
THERMOSTAT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
ROOM
THERMOSTAT
FLOW
SENSOR
S3
BUS
MIX VALVE
PUMP
L
L L
N
N L
N
S3
S3
Zone 3 sensor
3.7.3
Bus connections Block diagram 3
See the section “System management” for a detailed descrip-
tion of the connections between the modules.
MANAGING CONNECTIONS
BUS 2
BUS 1
PWM
SE
SB
SS
Modbus
MANAGING
MO1
0-10V TA
1
2
3
4
9 10 11 12 13 14 15 16 17 18
5 6 7 8
BUS 1
DEPENDING CONNECTIONS
BUS 2
BUS 1
PWM
SE
SB
Modbus
DEPENDING
0-10V TA
1
2
3
4
9 10 11 12 13 14 15 16 17 18
5 6 7 8
SC
MO1
BUS 2
ACCESSORY CONNECTIONS FOR ADDITIONAL ZONE
SAFETY
THERMOSTAT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
ROOM
THERMOSTAT
FLOW
SENSOR
BUS
BUS
MIX VALVE
PUMP
L
L L
N
N L
N
BUS
Summary of Contents for Condexa PRO 100
Page 32: ...32 INSTALLATION 7 Position the GAS manifold 8 Secure the GAS manifold to the frame 7 7 8...
Page 33: ...33 INSTALLATION 9 Position the manifold closing plugs from the required side 9 22mm 51mm...
Page 36: ...36 INSTALLATION 7 Position the GAS manifold 8 Secure the GAS manifold to the frame 8 8 7...
Page 37: ...37 INSTALLATION 9 Position the manifold closing plugs from the required side 9 22mm 51mm...