5. Remove the front door.
6. Remove the two retaining screws from the front top panel.
7. Open the control box cover.
8. Align the boiler's tapered interlocks with the notches on the control
box.
Fig.11
MW-2000680-03
5
5
Fig.12
MW-6000762-01
6
6
Fig.13
MW-6000763-02
7
90º
Fig.14
MW-6000764-01
8
5 Installation
7717201 - v03 - 25062019
MID _HMI T-control - Gas 120 ACE
19