5.9.6.
Connection possibilities for the PCB (SCU-
S03)
n
Installing the PCB
SCU-S03
C003820-A
SCU-S03
PCU 192
SCU-S
n
Connecting the board
Connect the BUS connector on the SCU-S03 board to the PCU board
in the boiler.
If the boiler is fitted with the control PCB (SCU-S03), then this is
automatically recognised by the automatic control unit of the boiler.
CAUTION
On removing this PCB, the boiler will show fault code
e[38
. To prevent this fault, an auto-detect must be
carried out after removing this PCB.
¼
See chapter: "Carrying out an auto-detect", page
n
Solar DHW sensor Tsol
The solar boiler temperature is controlled using a sensor. Connect
this sensor to the connector terminals
Tsol
.
T002879-A
SCU-S03
X2
X2a
X1
Tsol
Gps
Tsol
Gps
Hru
Hru
CALORA TOWER GAS 15S EX CALORA TOWER GAS 25S EX
CALORA TOWER GAS 35S EX
5. Installation
22/04/2016 - 300026141-001-07
49