#
Solid fuel boilers or any other boiler in which the energy input is not under effective thermostatic control, unless additional and
appropriate safety measures are installed.
#
Ascending spray type bidets or any other class 1 back syphonage risk requiring that a type A air gap be employed.
#
Steam heating plants unless additional and appropriate safety devices are installed.
#
Situations where maintenance is likely to be neglected or safety devices tampered with.
#
Water supplies that have either inadequate pressure or where the supply may be intermittent.
#
Situations where it is not possible to safely pipe away any discharge from the safety valves.
#
In areas where the water consistently contains a high proportion of solids, e.g. suspended matter that could block the strainer, unless
adequate filtration can be ensured.
#
In areas where the water supply contains chloride levels that exceed 250mg/l.
5.3 Choice of location
The cylinder must be vertically floor mounted. Although location is not critical, the following points should be considered:
#
The cylinder should be sited to ensure minimum dead leg distances, particularly to the point of most frequent use.
#
Avoid siting where extreme cold temperatures will be experienced. All exposed pipe work should be insulated.
#
The discharge pipework from the safety valves must have minimum fall of 1:200 from the unit and terminate in a safe and visible
position.
Summary of Contents for 1000 Indirect
Page 2: ......
Page 11: ......
Page 13: ...Figure 3 Indirect wiring diagram 1 Thermostat Option 2...
Page 15: ...Figure 4 Single phase wiring schematic...
Page 18: ...2 port zone valve...
Page 19: ......
Page 24: ......
Page 31: ......
Page 35: ...Figure 12 Auxiliary controls...
Page 36: ...Figure 13 Indirect controls page 18 8 Operation 8 1 General...
Page 45: ...3 7 8 Part No See table Part No 95 605 176 9 12 13 Part No See table Part No 95 605 182...
Page 46: ...14 15 Part No 95 607 367 Part No 95 607 425 16 18 19 21 Part No See table Part No See table...
Page 51: ...page 27 page 28 page 29 MAINS PRESSURE HOT WATER STORAGE SYSTEM COMMISSIONING CHECKLIST...
Page 52: ......
Page 54: ......