Coil surface area m2
2
3
5
7.5
15 l/min
29.4
28.7
31.3
32.9
35.0
30.1
40.2
37.5
30 l/min
43.6
41.8
52.7
51.4
63.6
61.2
98.4
86.4
Coil rating (kW)
60l/miin
59.7
55.8
76.9
76.5
97.9
91.7
132.2
126.4
15 l/min
43
55
80
91
112
130
180
225
30 l/min
29
38
48
59
62
72
99
124
Indirect heat time (mins)
60l/miin
21
28
32
39
40
50
48
62
15 l/min
0.002
0.001
30 l/min
0.004
0.008
0.006
0.007
Pressure drop through primary coil (Mpa)
60l/miin
0.032
0.044
0.025
0.03
Heat loss (kWh in 24h)
1.72
2.14
2.74
3.33
3.60
4.17
4.30
4.50
Hot water capacity (volume of water >40°C) drawn off
384
482
776
961
1206
1399
1930
2482
Weight full (kg)
505
610
964
1188
1569
1872
2445
2950
Weight empty (kg)
105
110
164
188
319
322
445
450
Max supply pressure
1.6 MPa (16 bar)
Max design pressure
0.8 MPa (8 bar)
Max operating pressure
0.6 MPa (6 bar)
Max expansion vessel charge pressure
1.0 MPa (10 bar)
Expansion relief valve setting
0.8 MPa (8 bar)
T&P valve setting
1 Mpa (10 bar), 90-95°C
Maximum primary pressure (indirect only)
0.3 MPa (3 bar)
Notes:
1. Indirect cylinders tested in conformance with BS EN 12897:2006.
2. Indirect heat up times based on a 45°C temperature rise, based on a primary flow temperature of 80°C +/- 2°C
Table 3: Inlet control kits and expansion vessel specification dependant on model
Commercial Cylinder
Volume (ltr)
Pressure Reducing Valve
Pressure Relief Valve
Single Check
Valve
400 - 500
1" Integrated inlet control valve
Summary of Contents for 1000 Indirect
Page 2: ......
Page 11: ......
Page 13: ...Figure 3 Indirect wiring diagram 1 Thermostat Option 2...
Page 15: ...Figure 4 Single phase wiring schematic...
Page 18: ...2 port zone valve...
Page 19: ......
Page 24: ......
Page 31: ......
Page 35: ...Figure 12 Auxiliary controls...
Page 36: ...Figure 13 Indirect controls page 18 8 Operation 8 1 General...
Page 45: ...3 7 8 Part No See table Part No 95 605 176 9 12 13 Part No See table Part No 95 605 182...
Page 46: ...14 15 Part No 95 607 367 Part No 95 607 425 16 18 19 21 Part No See table Part No See table...
Page 51: ...page 27 page 28 page 29 MAINS PRESSURE HOT WATER STORAGE SYSTEM COMMISSIONING CHECKLIST...
Page 52: ......
Page 54: ......