IMPORTANT
Please read & understand all these instructions before commencing installation.
Please leave this manual with the customer for future reference.
page 1
Contents
1. Introduction
1.1 General
1.2 Symbols used
1.3 Abbreviations
1.4 Liabilities
2. Safety
2.1 General safety warnings
2.2 Recommendations
2.3 Specific safety instructions
3. Technical specifications
3.1 Immersion allocation
3.2 Technical data
3.3 Dimensions and connections
3.4 Electrical diagram(s)
4. Description of the product
4.1 General description
4.2 Operation principle
4.3 Main components
4.4 Standard delivery
5. Before installation
5.1 Installation regulations
5.2 Installation requirements
5.3 Choice of location
5.4 Transport
Summary of Contents for 1000 Indirect
Page 2: ......
Page 11: ......
Page 13: ...Figure 3 Indirect wiring diagram 1 Thermostat Option 2...
Page 15: ...Figure 4 Single phase wiring schematic...
Page 18: ...2 port zone valve...
Page 19: ......
Page 24: ......
Page 31: ......
Page 35: ...Figure 12 Auxiliary controls...
Page 36: ...Figure 13 Indirect controls page 18 8 Operation 8 1 General...
Page 45: ...3 7 8 Part No See table Part No 95 605 176 9 12 13 Part No See table Part No 95 605 182...
Page 46: ...14 15 Part No 95 607 367 Part No 95 607 425 16 18 19 21 Part No See table Part No See table...
Page 51: ...page 27 page 28 page 29 MAINS PRESSURE HOT WATER STORAGE SYSTEM COMMISSIONING CHECKLIST...
Page 52: ......
Page 54: ......