The cylinder is covered by the Benchmark Scheme which aims to improve the standards of installation and commissioning of domestic heating
and hot water systems in the UK and to encourage regular servicing to optimise safety, efficiency and performance.
Benchmark is managed and promoted by the Heating and Hotwater Industry Council. For more information visit www.centralheating.co.uk.
Please ensure that the installer has fully completed the Benchmark Checklist and that you have signed it to say that you have received a full
and clear explanation of its operation. The installer is legally required to complete a commissioning checklist as a means of complying with the
appropriate Building Regulations (England & Wales).
All installations must be notified to Local Area Building Control either directly or through a Competent Persons Scheme. A Building
Regulations Compliance Certificate will then be issued to the customer who should, on receipt, write the Notification Number on the Benchmark
Checklist.
This product should be serviced regularly to optimise its safety, efficiency and performance. The service engineer should complete the
relevant Service Record on the Benchmark Checklist after each service.
The Benchmark Checklist may be required in the event of any warranty work.
Summary of Contents for 1000 Indirect
Page 2: ......
Page 11: ......
Page 13: ...Figure 3 Indirect wiring diagram 1 Thermostat Option 2...
Page 15: ...Figure 4 Single phase wiring schematic...
Page 18: ...2 port zone valve...
Page 19: ......
Page 24: ......
Page 31: ......
Page 35: ...Figure 12 Auxiliary controls...
Page 36: ...Figure 13 Indirect controls page 18 8 Operation 8 1 General...
Page 45: ...3 7 8 Part No See table Part No 95 605 176 9 12 13 Part No See table Part No 95 605 182...
Page 46: ...14 15 Part No 95 607 367 Part No 95 607 425 16 18 19 21 Part No See table Part No See table...
Page 51: ...page 27 page 28 page 29 MAINS PRESSURE HOT WATER STORAGE SYSTEM COMMISSIONING CHECKLIST...
Page 52: ......
Page 54: ......