Regada SP 0.1 Installation, Service And Maintenance Instructions Download Page 24

22 

 

 SP 0.1, SPR 0.1 

 

Manual control: 

 

If  needed  (during  adjusting,  function  checking,  failure  etc.)  the  stuff  can  change  setting  of  the 

controlled body using the handwheel.  

Instructions for manual control:

 

  Switch the power supply off. 

  Turn the button for gear disengagement to the right by 90° (Fig. 10), the button arrow shows the 

symbol of hand) what disengages the gear in the actuator. In case of lever actuator it is needed to 
hold the lever to prevent the device with load against stroke to the end position. 

  Set the actuator to the chosen position: 

a)

 For actuators with manual control:

 push and turn the hand wheel located on 

the actuator upper cover. While turning counter-clockwisely  the valve is turning 
in  the  direction  "closing".  Having  the  valve  in  the  required  position  turn  the 
button  for  gear  disengagement  to  the  position  "motored  operation"  what 
engages the gears. Put the hand wheel back to its original position. 
b)

 For actuators without manual control 

of the version with a stand and lever - 

using the lever. After resetting of the valve put the gear disengagement button 
to the original position. 

Note: 
After  putting  the  button  for  disengaging  of  gearing  again  to  the  position  of  motor 
operation if the gearing is not connected it is needed to turn the handwheel or the lever 
to put the gears into mesh.   

 

In case of manual control the set end positions are not mistuned. 

 

Actuators without gear disengagement cannot be manually controlled.  

 

4.2  Maintenance - extent and periodicity 

 

During inspections and maintenance is needed to tighten all screws and nuts that affect the 

tightness and coverage. Similarly, once a year should be checked and if necessary tighten mounting 
screws of the terminal wires and assuring of the slip-on joints with wires.

 

 

The interval between two preventive inspections is four years. 

The replacement of cover gaskets and gasket of an oil filling is needed in case of damage or after 6 
years of the operation. 

 

The grease in the supplied actuators is designed for the lifetime of the product. 
It is not necessary to change the grease during the operation of the actuator. 
 

Lubrication: 

  - gear part - grease HF 401/0 (GLEIT-

µ

) resp. GLEITMO 585 K 

       
 

Lubrication of the valve stem is independent on maintenance of the EA! 

 

After  every  potential  flooding  of  the  product  check,  whether  there  is  no  water  inside.  After  eventual 
water  penetration,  dry  the  product  before  repeated  putting  into  operation  and  replace  damaged 
sealings, resp. other parts of EA. identically check also tightness of cable bushings and replace them, 
if they are damaged. 
 

  Every  six  months  it  is  recommended  to  perform  one  check  move  in  frame  of  adjusted  operation 

stroke to verify reliability of functioning with setting back to the original position. 

   If  the  audit  rules  do  not  determine  else  the  inspection  of  EA  is  performed  ones  a year  and 

tightening of all connecting and grounded screws have to be checked to avoid overheating. 

    After  6  months  from  putting  of  EA  into  operation  and  once  a  year  it  is  recommended  to  check 

tightening  of  fixing  screws  between  the  EA  and  the  valve.  (Tighten  the  screws  with  the  cross 
system.) 

Fig. 9

Fig.10 

Summary of Contents for SP 0.1

Page 1: ...74 0803 03 Electric part turn actuators SP 0 1 SPR 0 1 INSTALLATION SERVICE AND MAINTENANCE INSTRUCTIONS...

Page 2: ...Operating angle Transmitter Warranty period months Input operating signal Serial number of electric motor Serial number of transmitter Serial number of position controller Tests made in accordance wi...

Page 3: ...1 Installation 12 2 1 1 Mechanical connection 12 2 1 2 Electric connection and checking of function 13 2 2 Dismantling 14 3 Adjusting of actuator 14 3 1 Output position changes 14 3 2 Adjustment of po...

Page 4: ...of actuator by a semiconductor components switches have to be consulted with producer 1 2 Safety instructions EA of SP and SPR types are reserved technical devices with higher rate of danger with pos...

Page 5: ...4 Warranty conditions The supplier is responsible for completeness of the delivery and guarantees these specifications of the product which are stated in the Contract The supplier is not responsible...

Page 6: ...on and operation of EA is possible in any position Usual position has vertical axis position of output part above armature and with control at the top Operating angle adjusted by stop ends must be gre...

Page 7: ...of corrosive pollution AF 2 with permanent exposure of big amount of corroding or contaminated chemicals and salt fog in execution for sea environment for sewage water disposal plant and some chemical...

Page 8: ...l part Fig 1 is placed on a control board consisting of electric motor 58 with capacitor 56 a torque unit controlled with a worm axial shift a position signalling unit 54 with a position transmitter 5...

Page 9: ...40 34 7 3 0 078 0 78 46 63 0 47 500 60 50 4 7 375 0 051 0 51 30 63 0 33 500 80 66 3 54 250 0 045 0 45 25 8 63 0 27 500 120 100 2 75 375 0 04 0 4 25 63 0 27 500 SP 0 1 SPR 0 1 type number 331 160 135...

Page 10: ...ce can be single side grounded Influence of resistance on output current 0 02 100 Influence of voltage on output current 0 02 1V Temperature dependency 0 5 10 C Output signal values at limit positions...

Page 11: ...k position transmitter Statistic data using RS 232 and personal computer number of controller operation hours frequency of relay switching in direction opening frequency of relay switching in directio...

Page 12: ...tric connection according to wiring diagrams 1 9 Conservation packing transport storing and unpacking Surfaces without surface treatment are treated by conservation preparation MOGUL LV 2 3 before pac...

Page 13: ...s not protected against direct climate influence Eventual damages to surface finish remove without delay thus preventing damage by corrosion If storing takes longer than 1 year it is necessary to insp...

Page 14: ...tuators SP R 0 1 are available in the following versions a With a flange F 03 F 04 or F05 in accordance with ISO 5211 Standard b With a stand and a lever a lever and a pull rod or without any lever wi...

Page 15: ...t is necessary to lead them separately with thrust wires or it is necessary to use shielded wires 2 The EA are delivered with bushings which in case of tight putting on the leads assure protection enc...

Page 16: ...e chapter 1 2 2 Requirements for professional qualification Disconnect the electrical servo drive from electrical power network Observe safety regulations The adjustment can be performed at a mechanic...

Page 17: ...icator in the EA SPR to function as a feedback in the position controller and if needed also in the position of a remote resistant position indicator Before the resistant transmitter adjustment the po...

Page 18: ...troke stated on the actuator s nameplate At values less than 75 the value 20mA is reduced proportionally Adjustment of the EPV in Electric Actuators SPR with controllers Disconnect the circuit with re...

Page 19: ...values of output signals in case they are reset The capacitive transmitter serves as a position transmitter of electric actuators with unified output signal of 4 20 mA in electric actuators SP 0 1 or...

Page 20: ...s 81 and 82 removing the jumper Connect power supply to the terminals 1 and 61 Disconnect the control signal from the terminals 86 and 88 Put the actuator to the direction OPENING or CLOSING with the...

Page 21: ...e switches and the position transmitter before adjustment of the controller Laying of adjusters and signalling elements on the board of the REGADA controller is shown on Fig 8 Fig 8 Table 2 D3 yellow...

Page 22: ...d closing and loads the adjusted parameters into the EEPROM memory In case that during the initialisation process an error occurs e g in connection or adjustment the initialisation process will be int...

Page 23: ...and troubleshooting 4 1 Service 1 In general it is provided that service of the EA is performed by a qualified worker in accordance with requirement given in Chapter 1 2 After putting the EA into ope...

Page 24: ...tent and periodicity During inspections and maintenance is needed to tighten all screws and nuts that affect the tightness and coverage Similarly once a year should be checked and if necessary tighten...

Page 25: ...pieces for repair purposes is allowed only by professionally qualified persons trained in the production plant or by a contracted service centre 5 Spare parts Spare part list Spare part Order Nr Posit...

Page 26: ...24 SP 0 1 SPR 0 1 6 Enclosures 6 1 Wiring diagrams Wiring diagrams for EA SP 0 1...

Page 27: ...n controller with resistant feedback connection Z239a position controller with current feedback connection Z257a 3 wire version of EPV without power supply connection Z260a 3 wire version of EPV with...

Page 28: ...with a jumper the jumper is placed in the plant If the output current signal is to be used the jumper is required to be removed 2 For the EA version with supply voltage of 24 V AC an earthling cable...

Page 29: ...SP 0 1 SPR 0 1 27 6 2 Dimensional drawings...

Page 30: ...28 SP 0 1 SPR 0 1...

Page 31: ...SP 0 1 SPR 0 1 29...

Page 32: ...30 SP 0 1 SPR 0 1...

Page 33: ...SP 0 1 SPR 0 1 31...

Page 34: ...32 SP 0 1 SPR 0 1...

Page 35: ...SP 0 1 SPR 0 1 33...

Reviews: