12
SP 0.1, SPR 0.1
2. Installation and dismantling of actuator
Abide by safety measures!
Notes:
Repeatedly verify whether placing of EA correspondents to part "Operating conditions". If actual
conditions differ from recommended, it is necessary to consult it with manufacturer.
Before starting of mounting the EA onto the valve:
•
Check again whether the EA was not damaged during storing.
•
Check whether the adjusted operation angle and connecting dimensions of the actuator (see the
nameplate) are in compliance with the valve parameters.
In case of inconsonance, perform adjusting according to the part Adjustment.
2.1 Installation
EA is by the producer adjusted to parameters according to the nameplate, with connecting
dimensions according to the corresponding dimensional drawing and put it to a mid-position.
2.1.1
Mechanical connection
The actuators can be installed and operated in any position. While installing leave enough space
for dismantling of the upper cover to allow adjusting of the control parts.
Before installation clean the contact areas of the actuator and the valve, coat the output shaft
and sliding areas with a grease without any acids.
The actuators SP(R) 0.1 are available in the following versions:
a) With a flange
F 03, F 04 or F05 in accordance with ISO 5211 Standard
b) With a stand
and a lever, a lever and a pull-rod or without any lever with output shaft of
square section
11x11 mm or circular section
∅
22 mm.
The flange actuators are to be connected with a valve using four bolts with a thread M5 (F03 and
F04 flanges) or M6 (F05 flange). The screw has to be screwed into depth of 10 mm or 12 mm.
The actuators with a stand are fixed to the base with two screws with thread 10. The screw
depth in the steel base must not be less than 10 mm, in case of a base made of aluminium alloy not
less than 16 mm.
The actuators with a small lever are connected with a controlled device with a lever mechanism
consisting of the two pull-rod TV-160 and a 1/4 " tube with
threads on the both ends. The actuators with a large lever
are connected with a controlled device with a lever
mechanism consisting of the two pull-rod TV-160 and a
1/2 " tube with threads on the both ends. While mounting
the coarse setting of the small lever on the actuator can
be changed with turning of the hub on the output shaft by
90 ° or with turning of the lever on the hub by 60 ° or with
the combination of the two operations by 30 °. Setting of
the large lever position can be reached with turning of the
lever on the splined shaft.
!
Fig.2
Summary of Contents for SP 0.1
Page 26: ...24 SP 0 1 SPR 0 1 6 Enclosures 6 1 Wiring diagrams Wiring diagrams for EA SP 0 1...
Page 29: ...SP 0 1 SPR 0 1 27 6 2 Dimensional drawings...
Page 30: ...28 SP 0 1 SPR 0 1...
Page 31: ...SP 0 1 SPR 0 1 29...
Page 32: ...30 SP 0 1 SPR 0 1...
Page 33: ...SP 0 1 SPR 0 1 31...
Page 34: ...32 SP 0 1 SPR 0 1...
Page 35: ...SP 0 1 SPR 0 1 33...