User Manual
FROG-9
Page14
Note 1:
It is emphasised that users must not rely on these recommendations alone. Persons best placed to judge
the risk of specific transfers are the onsite personnel that have experience of the local conditions and
equipment to be used. All factors must be evaluated together in their pre-transfer risk assessment.
Note 2:
Crews must conduct dry runs without passengers if there are any concerns about conditions to help assess
risk of transfer.
Table 2: Other Operating Parameters
Parameter
Recommendation
Wind Speed
30 knot (normal) / 40 knot (subject to assessment*).
* Feedback from the field indicates that all FROG models are very stable during high
winds and are considered suitable for operation in 30 knot winds. Transfers in 30 to
40 k
not winds are also considered to be acceptable, subject to RML’s
recommendation that operators must first perform the necessary risk assessments
and that trial transfers (without passengers) are used to confirm that controlled
lifting is possible, prior to the transfer of personnel.
Visibility
Crane Operator should have a clear view of the pickup and set down
areas.
Vessel Motion / FROG-9
Stability
Pitch 10⁰, Roll 10⁰. (FROG
-9
stable up to 35⁰ for a load of
1-9
Passengers. In static test).
Vessel Station-Keeping
Able to maintain position within a 5 m (15 ft) radius.
If a high risk of the vessel losing position exists, recommend
disconnecting FROG-9 for passenger embarkation.
Landing Area
Clear of obstructions, protrusions, trip and fall hazards.
Landing Area
–
Ice / Spills
Ice and spills must be cleaned from landing area prior to transfer.
Landing Area on Vessel
Recommended minimum 7.0 m x 7.0 m clear space (23 ft x 23 ft) based
on +/- 1 m landing ac 1 m entry and exit path for personnel
Smaller deck spaces require individual risk assessment with
consideration of reduced weather limits.
Landing
Area
on
Installation
Recommended minimum 4.6 m x 4.6 m clear space (15 ft x 15 ft) based
on + 1 m entry and exit path all round the FROG-9.
Crane
Operator
Experience
Briefing video within 1 month.
Local authority requirements for personnel transfer must be adhered
to.
Deck Crew Experience
Briefing video within 1 month.
Passenger Training
Briefing video within 1 month.
Communications
Radio communication must be established between the Crane
Operator and the vessel Deck Crew and Master.
Crane Construction
Crane must be certified for lifting personnel and properly maintained.
Operating Temperature
Standard HC9-01 Units: +50 deg C to -20 deg C.
Summary of Contents for FROG-9
Page 1: ...FROG 9 User Manual Rev 05 Issued 05 Mar 10...
Page 52: ...User Manual FROG 9 Rev 05 Page52 Link to Index...
Page 53: ...User Manual FROG 9 Rev 05 Page53 Link to Index...
Page 54: ...User Manual FROG 9 Rev 05 Page54 Link to Index Link to Index...
Page 55: ...User Manual FROG 9 Rev 05 Page55 Link to Index Link to Index...