User Manual
FROG-9
Page30
Pre-Operational Visual Check
–
A 9 POINT Check
Check
Description
Reference
1.
Main Lift-Eye Plug
Check main lifting eye is fully
engaged.
2.
Main Lift-Eye Plug M24 Bolts
Check three M24 lifting eye
bolts, nuts, split pins and tamper
proof seals are present and
secure.
3.
Back-Up Lift-Eye
Check nut, split pin and tamper
proof seal are fitted and in good
order.
4
Handling Lift-Eye
Check nut, split pin and tamper
proof seal are fitted and in good
order.
5.
M72 Keel Boss and M10
Cross Bolt
Check keel boss and cross bolt
are in position c/w split pin and
tamper proof seal. Do not go
underneath an active lift.
6.
Frame and Buoyancy
Check for any damage and
ensure that all bolts and
fasteners are present, tight and
secure.
7.
Seat Harness Security
Check seat harnesses operate
properly and attachment points
are secure.
8.
Load Test Plate
Check the date of the last load
test to ensure the unit is in
compliance.
9.
Lifting Sling Set
Check
slings
are
correctly
attached and in good order.
Check the split pins are fitted to
shackles. Slings should be in the
high visibility cover.
2
1
3
4
5
9
Summary of Contents for FROG-9
Page 1: ...FROG 9 User Manual Rev 05 Issued 05 Mar 10...
Page 52: ...User Manual FROG 9 Rev 05 Page52 Link to Index...
Page 53: ...User Manual FROG 9 Rev 05 Page53 Link to Index...
Page 54: ...User Manual FROG 9 Rev 05 Page54 Link to Index Link to Index...
Page 55: ...User Manual FROG 9 Rev 05 Page55 Link to Index Link to Index...