Connecting the Power Cables
4-12
SmartEdge 100 Router Hardware Guide
Figure 4-7
Installing the DC Power Cables
Install the AC Power Cord
To install the AC power cord, perform the following steps (see Figure 4-8):
1. Ensure that the circuit breaker toggle switch is set to the off position, which is marked by a stamped “0”
on the chassis rear panel.
2. Insert the AC power cord in the connector.
3. Secure the AC power cord to the circuit-breaker shield.
4. Plug the other end of the AC power cord to a building outlet that provides a 15A circuit.
Figure 4-8
Installing the AC Power Cord
Summary of Contents for SmartEdge 100
Page 4: ......
Page 8: ...viii SmartEdge 100 Router Hardware Guide...
Page 14: ...Ordering Documentation xiv SmartEdge 100 Router Hardware Guide...
Page 52: ...Connecting and Routing the Cables 4 18 SmartEdge 100 Router Hardware Guide...
Page 72: ...Obtaining Assistance 5 20 SmartEdge 100 Router Hardware Guide...
Page 90: ...FE and GE MIC and Native Port Cables A 6 SmartEdge 100 Router Hardware Guide...
Page 94: ...FE and GE Port Alarms B 4 SmartEdge 100 Router Hardware Guide...