4-INSTALLATION AND ASSEMBLY
24
ASSEMBLING THE CLADDING
ASSEMBLING THE SIDE PANELS
The product is supplied with the ceramic panels packaged separately, therefore unpack all the parts before proceeding with the assembly.
Follow the sequence below to assemble the panels:
• lift pellet loading lid
A
.
• Open door
B
.
• Remove the two front screws
C
and the two rear screws
C
.
• Remove lid
D.
• At this point take the three ceramic (side) panels
E
and insert them as shown in the figure.
The six ceramic side panels belonging to the kit, are all the same and therefore can be inserted equally on the right
or left of the stove. One must pay utmost attention when inserting them as the two insertion screws, on the ceramic
and on the stove, are different and therefore have a direction (detail below).