10
Equipment Room
Install CO detectors per local regulations. Boiler
requires yearly maintenance, see chapter “Checks,
adjustments and fault finding”.
Operating Limits of the boiler:
Max. Boiler Outlet Temperature: 200°F (99°C)
Max. Operating Pressure: 80 psi (5.5 bar)
The hot water distribution system must comply with all
applicable codes and regulations. When replacing an
existing boiler, it is important to check the condition of
the entire hot water distribution system to ensure safe
operation.
In addition, the unit shall be installed such that the gas
ignition system components are protected from water
(dripping, spraying, rain, etc.) during appliance opera-
tion or service.
Boiler Side
Min.
Clearances
from
Combustible
Surfaces
Minimum
Service
Clearances
Right Side
0”
1”
Left Side
0”
1”
Top
0”
24”
Front
Open
24”
Vent
1”
1”
Bottom
6”
12”
Table E: Clearances — Indoor Installations
Clearances
Indoor Installations
When installed according to the listed minimum clear-
ances from combustible construction, these boilers
can be serviced without removing permanent structur-
al construction around the unit. However, for ease of
servicing, we recommend a clearance of at least 24 in.
in front, on the rear and 24 in. above the top of the boil-
er. This will allow the unit to be serviced in its installed
location without movement or removal of the heater.
Service clearances less than the minimum may
require removal of the unit to service either the heat
exchanger or the burner components. In either case,
the boiler must be installed in a manner that will enable
the unit to be serviced without removing any structure
around the boiler.
NOTE:
Use of this boiler in construction areas
where fine particulate matter, such as concrete or
dry-wall dust, is present may result in damage to the
boiler that is not covered by the warranty. If operated
in a construction environment, a clean source of
combustion air must be provided directly to the
boiler.
Fig 4: Wall Mount Installation
Summary of Contents for 88AR-398A
Page 18: ...18 Fig 13 MODE 1 Single Boiler Primary Secondary Piping...
Page 19: ...19 Fig 14 MODE 2 Single Boiler Primary Secondary Piping with Indirect DHW on System Loop...
Page 20: ...20 Fig 15 MODE 3 Single Boiler Primary Secondary Piping with Indirect DHW on Boiler Loop...
Page 47: ...47 WIRING DIAGRAM Fig 46 Wiring Diagram...
Page 54: ...54 Fig 55 Boiler Lighting Shut Off Instructions...
Page 65: ...65 ILLUSTRATED PARTS LIST...
Page 66: ...66...
Page 67: ...67...