59
Monthly
1. Check flue, vent, stack, or dampers.
2. Test high and low gas pressure interlocks (if
equipped). (See “Safety Inspection”.)
Semi-Annually
1. Recalibrate all indicating and recording gauges.
2. Check flame failure detection system components.
3. Check firing rate control by checking the manifold
pressure. (See “Manifold Check”.)
4. Check piping and wiring of all interlocks and shut-
off valves.
Annually
1. Test flame failure detection system.
2. Test high limit and operating temperature. (See
“Post Start-Up Check”.)
3. Check flame sensor.
4. Refer to Table U for gas valve combustion read-
ings.
5. Check valve coil for 60-cycle hum or buzz. Check
for leaks at all valve fittings using a soapy water
solution (while unit is operating). Test other oper-
ating parts of all safety shut-off and control valves
and increase or decrease settings (depending on
the type of control) until the safety circuit opens.
Reset to original setting after each device is test-
ed.
6. Perform leakage test on gas valves, if required by
local codes.
7. Inspect and clean burner using shop air.
8. Clean the combustion chamber coil, using the pro-
cedure on the following page.
As Required
1. Recondition or replace low water cut-off device (if
equipped).
2. Check drip leg and gas strainers.
3. Check flame failure detection system. (See “Post
Start-Up Check”.) Verify high and low fire flame
signal, compare to start-up data.
4. Check igniter. Clean and verify spark gap (see
Fig. 56).
5. Check fan speed and manifold pressure. (See
“Blower Check” and “Manifold Check”.)
6. Test safety/safety relief valves in accordance with
ASME Heater and Pressure Vessel Code Section
IV.
Summary of Contents for 88AR-398A
Page 18: ...18 Fig 13 MODE 1 Single Boiler Primary Secondary Piping...
Page 19: ...19 Fig 14 MODE 2 Single Boiler Primary Secondary Piping with Indirect DHW on System Loop...
Page 20: ...20 Fig 15 MODE 3 Single Boiler Primary Secondary Piping with Indirect DHW on Boiler Loop...
Page 47: ...47 WIRING DIAGRAM Fig 46 Wiring Diagram...
Page 54: ...54 Fig 55 Boiler Lighting Shut Off Instructions...
Page 65: ...65 ILLUSTRATED PARTS LIST...
Page 66: ...66...
Page 67: ...67...