MT5 Multi-Tracer Operating Manual
page 7
3. Setup
Basic setup of the MT5 System is straight forward and requires a few key steps:
1) Hardware Installation.
2) Establish a network connection.
3) Configure operating parameters.
Each of these is discussed, in detail, in the following sections
3.1. Hardware Installation
Follow these basic steps for proper installation:
1) Mount the MT5 Controller and Load Unit(s).
2) Connect AC power (but leave units turned off).
3) Connect MT5 Load unit(s) to MT5 Control Unit using provided cable.
4) Connect PV modules, temperature sensors, and other signals.
5) Power up the MT5 Load and Control units.
6) Allow approximately 2 minutes for the MT5 System to boot.
7) Test Network Connection.