Running one passage
Layout:
Length of testing area: 60 to 70 m
Figure 8.13:
Layout for one passage
Preparing one passage:
Choose a similar fertiliser from the fertiliser chart and adjust the spreader ac-
cordingly.
Set the mounting height of the machine as specified in the fertiliser chart.
Make sure that the mounting height includes the top edge of the trays.
Check the spreading elements (spreading discs, spreader vanes, outlet) for
correct functioning and completeness.
Place two collecting vessels one after another at a distance of
1 m
in the over-
lap zones (between the tramlines) and one collecting vessel in the track (ac-
cording to
).
NOTICE
We recommend the layout plan up to a spreading width of
24 m
. A layout plan
for greater working widths is attached to the PPS5 practise test kit.
1/2x
1/2x
x
Summary of Contents for MDS 8.2
Page 8: ...Intended use 1 2...
Page 28: ...Safety 3 22...
Page 38: ...Technical data 4 32...
Page 42: ...Axle load calculation 5 36...
Page 44: ...Transportation without tractor 6 38...
Page 86: ...Machine settings 8 80...
Page 96: ...Calibration and discharging residual material 9 90...
Page 110: ...Important information on spreading 10 104...
Page 114: ...Faults and possible causes 11 108...
Page 146: ......